
Built for Healing
The award-winning Gold Coast Secure Mental Health Rehabilitation Unit (SMHRU) is a purpose-built facility designed to provide a safe, therapeutic environment for individuals requiring long-term mental health care. The unit integrates advanced safety features and durable infrastructure to support both patient wellbeing and staff efficiency.
Galvin Engineering was proud to supply a comprehensive suite of specialised plumbing fixtures and fittings tailored to meet the stringent requirements of secure mental health environments.
Project Requirements
The facility required products that:
- Minimise ligature risks
- Withstand vandalism and heavy use
- Support infection control and hygiene
- Comply with healthcare regulations and standards
Our Solutions
To meet the complex safety and operational requirements of the Gold Coast Secure Mental Health Rehabilitation Unit, a tailored selection of products was supplied from the GalvinCare® and Wallgate ranges. These solutions are purpose-built for secure environments, combining ligature resistant design, vandal resistance, and water efficiency.
Key product categories included:
- Ligature resistant tapware and shower fittings to reduce self-harm risks while supporting patient independence
- Vandal-resistant sanitaryware such as solid surface basins and pans, designed for durability and tamper-proof installation
- Water control systems including pneumatic dual flush cisterns and sensor-activated assemblies, promoting hygiene and sustainability
- Secure drainage solutions compatible with vinyl flooring, ensuring long-term performance and ease of maintenance
These product ranges helped create a safer, more therapeutic environment while supporting compliance with mental health facility standards and reducing long-term maintenance costs.
Outcome
The integration of Galvin's specialised products has helped create a secure, hygienic, and efficient environment at the Gold Coast SMHRU. The facility now benefits from:
- Enhanced patient and carer safety
- Reduced maintenance costs
- Compliance with mental health facility standards
- Improved water efficiency
Watch the video below to see inside the unit and learn about Gold Coast Health's person-centred model of care:
Key Data
| Location: G Block, Gold Coast University Hospital, 1 Hospital Boulevard, Southport QLD 4215 | Builder: BESIX Watpac |
| Project completion: March 2025 | Architect: ARCH |
| Plumbing contractor: ADCO, XT Plumbing | Value of overall project: $123 mio. |
Products Installed







